Case Study
Closed Loop Cooling Water System
RHOADS SOLUTION Rhoads recommended a phased approach to this project. Phase 1 of the CLCW piping system interconnected two fully independent pumps, a plate heat exchanger, two duplex strainers, an ion exchanger and a compression tank. This phase required approximately 900 linear feet of Schedule 40 welded stainless steel piping ranging in size from 1/2 inch through 18 inches. In addition, this piping system required more than 137 slip-on we