RHOADS SOLUTION The project began with the need to install the required CMU block walls, but this grew into a mandate to rig and install equipment supplied by three separate original equipment manufacturers, which included dough dispensing and dry ingredient systems, a fryer line and a packaging line. Rhoads also designed a palm oil system, ran an air main from the location’s power house and installed over 13,000 feet of carbon and sta