Pages 4 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Clock Spring Takes on Onshore Renery Repair PIPE DETAIL 12-inch (305-mm) diameter pipe SUMMARY Severe galvanic and crevice corrosion over a 150 m (492 feet) length of pipe four stories off the ground. Working in harnesses with minimal scaffolding, a team of 10 technicians carried out repairs with the line in use. More than 41 Clock Spring coils were used to repair 20 corroded areas. The repair restored the pipeline to safe service without interrupting operations. The installation of the Clock Spring repair enabled the refinery to meet its safety objectives to maintain its high operating standards. An owner of an onshore refinery in the Far East has named Clock Spring a pre