Case Study

Clock Spring Provides Permanent Repair to Damaged Refinery Pipeline

Clock Spring Provides Permanent Repair to Damaged Refinery Pipeline

Pages 3 Pages

THE HIGH-PERFORMANCE CRITICAL INFRASTRUCTURE COMPANY Easy to Install | Cost Effective to Deploy | Durable for Decades Clock Spring Provides Permanent Repair to Damaged Renery Pipeline PIPE DETAIL 8-inch (203-mm) diameter pipe Air/Gas mixture 900 feet (274 m) of pipeline SUMMARY Extensive corrosion from an airborne drift from a cooling tower that affected 900 feet (274 m) of line A Clock Spring trained repair team applied 903 Clock Spring units over 900 feet (274 m) of pipe that included 90-degree and 45-degree fittings in tight spaces The pipeline and surrounding lines and process equipment remained in service during the repair. Work was completed within 3 weeks No hot work or heavy equipment required The Clock Spring solution addressed the immediate problem and provided a repair that wou