August 2011 Roofing Sika at Work Roofing Application Field: Cold Fusion Bonded Built-Up Roof System and Steridex Case Study at Clairemont Court, PutneyProject Requirement This swimming pool building located at Clairemont Court in Putney was in need of some internal and external refurbishment. The roof deck joists were rotten, which meant a new roof deck needed to be laid and waterproofed. Internally the walls required a coating that could withstand moisture without leading to mould growth, as was the result with the previous emulsion coating. Sika Liquid Plastics Solution Sika Liquid Plastics’ Cold Fusion Bonded Built-Up Roof System was specified for the project. The full system consists of a Vapour Control Layer, Decotherm insulation, and a Carrier Membrane all bonded with D