Clackmannanshire Bridge

Clackmannanshire Bridge

Pages 2 Pages

Completion: Clackmannanshire Bridge 2007 Clackmannanshire Bridge Project summary Bridge project: Bridge project: Crossing point for the A378 Start/finish dates: Start/finish dates: 2006/2007 Bridge type: Bridge type: Pier bridge Length: Length:1.2km (50m main span) Structure: Structure: Multi-span, incrementally launched segments, concrete mono piles (5m dia), cages, hollow column stems Production: Production: In situ concrete pour, down -10ºC a