Case Study
Church of Our Lady, Star Of The Sea, Ilfracombe
Interior of the church before reordering. Existing floor constructed from concrete slab. Slab was too poor to save so new one was cast. Church of Our Lady, Star Of The Sea, Ilfracombe, 2011 © 2011 JUPITER Heating Systems Limited T: 01276 859 066 www.jupiterunderfloorheating.com Case Study 21 System IDEAL and S.R.T. substrate for timber floor External view of the roman Catholic church, Church Of Our Lady, Star Of The Sea. J:\marketing\sales