Case Study
St Peters & St Pauls Church, Ashington, Sussex
For maximum output a total area of 150 m² of IDEAL E PS Edge Zone panels were used. These panels have the pipes positioned at 125mm centres. The void left by the removal of the existing floor was filled with recycled foamed glass which replaced traditional hardcore and concrete. The foamed glass also provides additional insulation. St Peters & St Pauls Church, Ashington, Sussex, November 2009 Architect: Lee Evans Partnership Main Contractor: