Case Study
Christmas Deliveries
The Challenge VolkerRail were undertaking a Christmas ‘blockade’ - where a section of track is closed down to enable refurbishment - and required continuous supply of materials over the period 24th to 28th December. Because this was an unexpected demand with a tight schedule, delivery failures were not an option. The materials (which were for Overhead Line cable and structures, assemblies and structures) were critically important to the