Case Study
Chiswick Green
| Chiswick Green | Case study | 1 Case study: Chiswick Green Chiswick Green is a six-storey office containing 8,733m 2 of modern, open-plan, high quality working space with a high specification finish. An excellent example of a collaborative BAM project. Sustainable design The aim of the project was to provide a high quality commercial space with an excellent internal environment and minimal running costs compared with older, less efficient buildings. This was achieved by focusing on the energy efficiency measures from the design stage, including excellent air tightness and other passive measures, with efficient equipment and controls. We added renewable energy technologies to reduce the running costs even further. In addition prefabrication was incor