Case Study

Chiswick Bridge

Chiswick Bridge

Pages 1 Pages

E: info@stonewest.co.uk T: 0208 684 6646 Stonewest Ltd, 67 Westow Street, Crystal Palace, London, SE19 3RW www.stonewest.co.uk Description: Built in 1933 and designed by engineer Alfred Dryland and Sir Herbert Baker, Chiswick Bridge uses reinforced concrete to span over 600 ft and is clad with over

Join for free to read