Case Study
ChevronTexaco “Genesis”
PROJECT ChevronTexaco “Genesis” CASE STUDY CLIENT ChevronTexaco OTHER PARTNERS 8.38% ExxonMobil, 4.95% FINA DETAILS Classic SPAR, 122-foot diameter 2,590feet (790meters) water depth 2 decks, 3 levels PROJECT TEAM McDermott Engineering (Engineering) J. Ray McDermott (Shipyard) Aker Rauma (Hull Fabricator) INSTALLATION Amelia, LA USA (onshore) Pori, Finland (hull fabrication) Green Canyon 205 (offshore) SYSTEMS SELECTED FOR FIBERBOND®: • Firewater, seawater, open drains • 7,400feet (2,255meters) of piping, up to 20” (500NB) • ABS- and USCG-type approved products • 200psig (13.8bar) design, 300psig (20.7bar) hydrotest FIBERBOND® SCOPE • Supply of materials • Shop prefabrication • Site installation including FRP welding • Installation of supports, installation of flanges, and commissioning