Case Study
Air Lines Beverwijk
CASE STUDY Project Air Lines Beverwijk Location Beverwijk, Holland end USer Slibverwerking, Beverwijk (Silt treatment, Beverwijk) contractor Stork, Wescon conSULtant Haskoning comPLetion date 1995 deScriPtion In a silt treatment plant, the contaminated silt is mixed with a biomasse. When heated up to a certain temperature this biomasse becomes active and absorbs the contamination in the silt. Hot air is used to elevate the temperature. The transport and supply of this hot air (90 0C) is done through glassfiber reinforced epoxy pipes. PiPe SYStem The supplied pipe system is an EST system up to 600 mm. Total project value has been approximately NLG. 1,000,000 ScoPe Our scope included: • Engineering • Fabrication • Installation the FPi advantage The high temperature resistance combine