Case Study

Channel Tunnel Rail Link (Contract 342)

Channel Tunnel Rail Link (Contract 342)

CASE STUDY Channel Tunnel Rail Link (Contract 342) Ebbsfleet, Kent Ebbsfleet, Kent Ebbsfleet, Kent Ebbsfleet, Kent Reinforced Earth TerraClass® Retaining Walls Client: Union Railways (North) Ltd Consultant: Rail Link Engineering Contractor: Hochtief Norwest Holst JV Construction: 2004 System: TerraClass® Wall Area: 3000m² Max. Height 10m Design Load: 50 kN/m 2 rail surcharge loading Design Life: 120 years Backgr