Case Study
A6 Matlock Diversion
CASE STUDY A6 Matlock Diversion Derbyshire Derbyshire Derbyshire Derbyshire Reinforced Earth TerraTrel™ Retaining Walls Client: Sainsburys Consultant: Gifford Contractor: Birse Construction: 2007 System: TerraTrel™ Wall Area: 1350m² Max Height: 8m Design Load: HB + high containment parapet impact Design Life: 120 years Background Background Background Background As part of the A6 Relief Road project, the disu