Case Study
Certification of bundle design for Bureau Veritas
The problem We were asked by Bureau Veritas to support them in certi cation of the design of the West Franklin Bundle. This bundle contained two pipe- in-pipe production lines and was to be towed from shore to the eld. The solution We carried out a detailed and thorough review of key project design documentation and recommended areas for further development and improvement. We worked closely with Bureau Veritas and the design house to ensure optimum solutions were reached in the most practical way. The purpose of the review was to a rm the acceptability of the design and installation procedure. Therefore three main points were considered during the certi cation: selection of applied loading, compatibility of components and calculation methodology. In order to assess these points several a