Case Study
Central Wastewater Treatment Plant 335-MGD Influent Pump Station, Dallas Water Utilities
11 10 FNI developed an investigation/study, conducted preliminary design, final design and facilitated construction phase services for the new Influent Pump Station (IPS) to serve the Central Wastewater Treatment Plant and enhance peak wet-weather flow management. The study phase included a detailed analysis of anticipated design flows, major equipment, site analysis, and hydraulic evaluation. Stage 1 design and construction involves the dem