Case Study
CENesis PHASE solution increased ESP run time, eliminated gas-related shutdowns
CENesis PHASE solution increased ESP run time, eliminated gas-related shutdowns Challenges • Rapid production decline • High gas-to-liquid ratio • High free gas at the pump intake • Anticipated low production and higher GLR Results • Eliminated gas-related shutdowns • Enabled the well to produce with higher gas-to-liquid ratio and low production • Increased ESP run life by 107 days to date • Reduced OPEX A key operator in the Delaware basin was producing from the Bone Spring reservoir using a competitor’s electrical submersible pumping (ESP) system, but the ESP failed after just 273 days. The unconventional horizontal well had higher gas content in the fluid steam compared to offset wells. The operator contacted Baker Hughes, a GE Company (BHGE), for a solution to improve