Case Study

CENesis PHASE multiphase encapsulated production solution increased gas/fluids production 126% and 123% respectively

CENesis PHASE multiphase encapsulated production solution increased gas/fluids production 126% and 123% respectively

Pages 2 Pages

CENesis PHASE multiphase encapsulated production solution increased gas/fluids production 126% and 123% respectively Challenges • High gas-to-liquid ratio (>4,500 SCF/STB) • Gas slugging • Potential for motor overheating and pump gas locking • Wide flow range (3,000 down to 200 BFPD) • Fluctuating fluid density • Remote location with inconsistent electrical generation • Lack of three-phase power to the wellsite Results • Removed fluids quickly to increase gas production from 1,900 MMcf/d to 4,500 MMcf/d and to increase oil production from 177 BOPD to 396 BOPD • Extended ESP run life by 200+ days or 73% compared to the average ESP run life in similar applications • Lowered bottomhole pressure significantly compared to gas lift Baker Hughes, a GE company (BHGE), was app

Join for free to read