Case Study
Car Parking
ISSUE Additional car parking spaces were required at the clients premises in Wollaton, Nottingham. The planned location was an existing grassed area adjacent to their current full to capacity car park. The client required a reinforcement surface that kept the natural grassed finish and allowed full water penetration in-line with Sustainable Urban Drainage (SUDS) requirements and that was capable of withstanding everyday vehicular traffic.