Case Study

Parking

Parking

Pages 2 Pages

10 More parking means students are on time CURTIN UNIVERSITY OF TECHNOLOGY comparison of three steel framing options with various concrete deck schemes. The three options considered were: 1. a steel portalised frame with precast concrete Deltacore planks spanning parallel to the longitudinal axis of the deck. A cast in-situ concrete topping would be placed over the Deltacore planks; 2. similar to option 1, but with the Deltacore plank

Join for free to read