Case Study
Parking
10 More parking means students are on time CURTIN UNIVERSITY OF TECHNOLOGY comparison of three steel framing options with various concrete deck schemes. The three options considered were: 1. a steel portalised frame with precast concrete Deltacore planks spanning parallel to the longitudinal axis of the deck. A cast in-situ concrete topping would be placed over the Deltacore planks; 2. similar to option 1, but with the Deltacore plank