Case Study
Capital Gate
In order to redevelop the F&B strategy, 3SixtyConsult were introduced by the Developer (ADNEC) and novated to the Main Contractor Habtoor Leighton Group (HLG). 3Sixty undertook a detailed review of the architectural and MEP design, existing installations and the current procurement plan. The Benefit ADNEC’s ultimate goal was to hand over a fully compliant and approved “ready to operate” hotel by December 2011 and through 3Sixty’s intervent