Case Study
OSN Campus Extension
The Benefit Due to our experience, 3SixtyConsult was quickly able to identify key risks in the existing buildings MEP services. As the building was built in 2001, it predated many of today’s statutory regulations. As a result, we quickly established a team for the sole purpose of creating the missing as-builts, identifying what of the existing systems could feasibly be upgraded to current regulatory standards, and liaising with the local a