Case Study
Capacity Expansion for Transportation Project
Case Study April 2016 D352384X012 Capacity Expansion for Transportation Project San Antonio’s Project, Bolivia Using PipelineStudio ® from Emerson (formerly Energy Solutions International), Transierra S.A. has successfully planned and optimized a capacity expansion for a critical natural gas pipeline Margarita Natural gas fi eld output is connected through a 10“ set line (17km) with Sabalo GASAN gas fi eld export lines 28“ OD (20km), which goes to Villamontes GASYRG compressor station (MOP 1440 Psig) and is connected with Yabog. Average Volume Margarita = 1.43 Mmcd Average Volume San Antonio = 13.39 Mmcd total Volume SAN + MGT = 14.82 Mmcd Pressure out San Antonio = 1080 Psig Pressure in Villamontes = 1030 PsigMidstream Oil and Gas Solutions 2 www.EmersonProcess.com/Remote April 2016 “G