Case Study
Candlewood Suites
introduction Extensive development in the vicinity of the new Downtown North Hartford Baseball Stadium includes the site of a new 8-story, 53,400 square foot Candlewood Suites hotel. Foundation loads for the steel-framed structure range from 400 to 800 kips with areas of isolated tension demand on braced-frame footings. GEotEcHnicAL conditionS Subsurface conditions at the site included up to 8 feet of variable, debris fill underlain by soft to