Case Study
Camscan Proves Vital
CAMSCAN ™ PROVES VITAL TO SUCCESSFUL TIEBACK. Downhole visualisation capability keeps tieback project on track, preventing extended drilling delays. THE PROBLEM THE SOLUTION Claxton mobilised a CAMSCAN ™ system offshore at short notice. This was deployed downhole on drillpipe to inspect the mudline suspension hanger threads and the seal surfaces. THE RESULT The CAMSCAN ™ images enabled the drilling supervisor to decide to utilise a ratch-a-latch