CAMDEN LOCK VILLAGE

CAMDEN LOCK VILLAGE

Pages 2 Pages

The brief Mace’ brief revealed plans for eight buildings, a new canal-side market, cafes, restaurants, cinema, 195 residential units, a food quarter and a commercial space. Located right in the heart of Camden, the project required four new gas mains connections, supplying an energy centre and sitewide gas mains for several units. The project Squire Energy’s work began in 2016 with a site visit in January, with the view to lay and complete in the summer of the same year. The scope of work was fairly straightforward, with two parent pipes supplying the four connections; three from the 18in main on Castle Haven Road and one from the 90mm main on Chalk Farm Road. The project plans were drawn; a 315mm connection and main from Castle Haven Road, with 10-inch steel pipe connec