The brief In 2017, Squire Energy was approached by Welsh Power Ltd. for design, construct and commission of a new intermediate gas main and primary gas meter to connect Banbury Power Station to the main natural gas supply. As well as facilitating the gas supply, Squire Energy was also asked to install two electricity ducts and a communications cable to facilitate the electrical power connection away from the power station to the electrical grid. Crucially, the brief required a team which had the expertise and experience to drill under the River Cherwell, a Cherwell side stream, across Spiceball Park, across a road and under Oxford’s historic canal. Squire Energy stepped up to the mark. BANBURY POWER STATION Background As one of the UK’s most reputable gas infrastructure