Case Study
Cambridge Health Alliance
Solution The Sodexo Energy and Construction Services team went to work on a satisfactory resolution by creating a central heating loop to convert patient areas from electric heat to hot water heat by oil and natural gas. Controls were installed that allowed access from each nursing station. Nurses were given the ability to check and adjust the temperature in the patient rooms from a wall-mounted touchpad located in the nurses’ station. Th