Case Study

Calders Wharf is undergoing regeneration, with the existing community centre being demolished to allow for the development of a new purpose-built faci

Calders Wharf is undergoing regeneration, with the existing community centre being demolished to allow for the development of a new purpose-built faci

Pages 2 Pages

Calders Wharf is undergoing regeneration, with the existing community centre being demolished to allow for the development of a new purpose-built facility together with 25 new homes. With the DLR tunnels located directly beneath the site, continuous monitoring was required to understand the impact of the works on the surrounding infrastructure. Summary of the works Client: Telford Homes Start Date: March 2017 Completion Date: May 2018 System 3D prism targets Automated Total Stations Data loggers Calyx Online Monitoring SoftwareTM ITM Monitoring, now SOCOTEC Monitoring UK Ltd, is pleased to be working with Telford Homes and Docklands Light Railway (DLR) on this project, providing the design and installation of a rigorous monitoring system within the north and southbound tunnels. The fully a

Join for free to read