Case Study

Cadbury

Cadbury

The temperature within Cadbury's data centre was rapidly increasing, it was imperative the room’s temperature was reduced immediately. Rapid’s reactive and emergency cooling service ensured considerable problems and costs were avoided. A situation had arisen in Cadbury’s data centre due to failure of the fixed air conditioning system. The temperature within the data centre was rapidly increasing, it was imperative the room’s temperature was reduc