Case Study

BT Fleet re-fit and mobilise 1,700 vehicles for Openreach

BT Fleet re-fit and mobilise 1,700 vehicles for Openreach

Pages 2 Pages

The Challenge The primary objective was to provide new engineers with a road ready vehicle from existing stock. This meant controlling delivery from the garage network to ensure each engineer received the right vehicle specification for the job and that every vehicle met the safety and compliance standards for which BT Fleet is renowned. The challenges for BT Fleet were as follows: • The large volume of vehicles required • Preference t

Join for free to read