Case Study

Bridge Tubular Member Structural Reinstatement—AMPA Field, Brunei, Darussalam

Bridge Tubular Member Structural Reinstatement—AMPA Field, Brunei, Darussalam

Pages 1 Pages

Bridge Tubular Member Structural Reinstatement—AMPA Field, Brunei, Darussalam CASE HISTORY Structural Services The objective of the grout ?lling was to arrest the ongoing corro- sion of the bridge members and strengthen sec ti ons of the mem- bers that had been subjected to corrosion a tt a c k, thus re i n s t a ti ng the integrity of the bridge. The majority of the members that were grouted, including verti cal, horizontal and diago

Join for free to read