Case Study

Brecon Mountain Railway (BMR) selected INECO Energy to upgrade their lighting within their engineering workshop and train parking sheds.

Brecon Mountain Railway (BMR) selected INECO Energy to upgrade their lighting within their engineering workshop and train parking sheds.

Pages 1 Pages

Background The Brecon Mountain Railway parks their steam locomotives in a purpose built building which includes a workshop and viewing gallery. The light levels were very poor and staff needed additional lighting. The public’s view and experience was also affected. Electricity costs were high due to the old, inefficient lighting and maintenance was also a safety concern due to height and floor configuration. t e w : 029 2002 1777 : info@inecoenergy.com : www.inecoenergy.com Registered in England & Wales 10477244 Solution Brecon Mountain Railway (BMR) selected INECO Energy to upgrade their lighting within their engineering workshop and internal steam train parking sheds. The design had to consider the challenges delivered by the heat and vapour from the steam trains as they

Join for free to read