Case Study
Brampton, Cumbria – 4MW Generator
Case Study Brampton, Cumbria – 4MW Generator CLIENT: Messrs Bowman LOCATION: Brampton, Cumbria DURATION: 12 months Prospus Energy were approached to secure consent for a 4MW diesel generation plant and wayleaves to run the cable back to the point of connection on the electrical grid. Details Prospus undertook the required work to develop and submit a detailed planning application for the project, including the following: • EIA and HRA screening and scoping opinion request • P l a n n i n g s t a t e m e n t • Design and access statement • Ecology reports; the topographic survey • Flood risk assessment for the site • Development of all site plans • Air quality impact assessment • N o i s e as s e s sme n t • Traf c and transport assessment • A cultural heritage