Case Study

Boston Logan International Airport Runway 9-27

Boston Logan International Airport Runway 9-27

Pages 2 Pages

Boston Logan International Airport Runway 9-27 Boston, Massachusetts Airport’s busiest runway overhauled with minimal disruptions Design and bid documents completed in under three months First U.S. airport to pave runway using warm-mix asphalt Runway was rehabilitated and aircraft operations returned as quickly as possible As project designer and construction administrator, HNTB designed the rehabilitation of Boston Logan’s Runway 9-27. After 17 years of handling approximately 10,000 aircraft each month, the runway was due for rehabilitation. When federal grant money became available, the Massachusetts Port Authority accelerated the project. HNTB completed design and prepared bid documents in less than three months. Because disruptions at Logan can delay air travel nationwide and inter

Join for free to read