Case Study
Bonnycraig WTW UV
Bonnycraig WTW UV Project Title: BONNYCRAIG WTW UV Client: Scottish Water Project Value: £300,000 Award Date: 21st Feb 2017 Project Commenced: 21st Feb 2017 Project Completed: 31st March 2017 Scottish Water contacted Ross-shire Engineering to deliver a UV Treatment solution within the existing works. Utilising our virtual design capability we were able to design a solution which included the installation of a UV filtration system into the existing building. Working within the building constraints meant that the new pipework required to connect the UV system to the existing pipework would need to be placed under the concrete floor, as illustrated below. Scottish Water required the new plant online within a very tight time scale to maintain water quality. Utilising