BOILER TUBE FAILURE THERMOHYDRAULIC ANALYSIS The boiler hopper tubes at an Eskom Power Station suffer from continuous mechanical failures that lead to frequent unplanned maintenance. Using Flownex SE coupled to ANSYS, various hypotheses to the cause of these failures could be examined without affecting plant operations. The project involved several first of its kind engineering practices, which included: • The first full transien