Pipe failure

Pipe failure

Pages 2 Pages

Pipe failure A HRL case study2 hrl: Pipe failure Sales gas is sent to Adelaide and to Sydney, and Ethane is sent to Qenos in Sydney. Amongst the critical components within this process are a number of large steam generating boilers that provide process steam to plant. During a routine inspection of boiler 10 an operator discovered a significant steam leak from a main steam pipe that resulted in the immediate closure of this boiler and a significant drop in gas production. HRL determined the root cause for this failure and provided the welding and engineering expertise to repair this major component and return it to service. Challenge A 250 mm diameter alloy steel main steam pipe containing superheated steam failed leaking high temperature steam onto a walkway. This res