Case Study

Boiler Installation

Boiler Installation

Pages 1 Pages

Boiler Installation Case Study Facility: Major Hospital Installation Requirement: Install four (4) customer provided 400HP, 130psi Steam Boilers and associated equipment. Installation Parameters: Installed piping, airators, condensate tanks, associated feed pumps and made necessary accomodations to interface with existing piping system, including water treatment application and remote shut off switch. The installation also included strainers, valves, pipe fittings, and connectors. Repair Time / Constraints / Opportunities: We provided an uneventful on time installation for the customer. ThermaServe Mechanical Systems Services www.thermaserve.com T (904) 260-8002 * F (904) 260-8004 * sales@thermaserve.com FL#CMC057091 * GA#CN20936

Join for free to read