Case Study

BLS AlpTransit

BLS AlpTransit

Pages 2 Pages

ABB – telephone +41 58 585 11 84 – www.abb.com/railway  Traction Power Supply Delivering power for a new high speed railway line crossing the Alps ABB has won the turnkey contract for traction power supply and power distribution systems for the new Lötschberg base line.       The Need On the Lötschberg, as part of the NRLA concept, the new Lötschberg base section is being

Join for free to read