Case Study
BLS AlpTransit
ABB – telephone +41 58 585 11 84 – www.abb.com/railway Traction Power Supply Delivering power for a new high speed railway line crossing the Alps ABB has won the turnkey contract for traction power supply and power distribution systems for the new Lötschberg base line. The Need On the Lötschberg, as part of the NRLA concept, the new Lötschberg base section is being