Biomass Boiler Facility

Biomass Boiler Facility The project consisted of the construction of a new 6.0MW Biomass Boiler at the BSW Newbridge Sawmill near Builth Wells. The new facility allows the Sawmill to power drying kilns from waste timber material. The works comprised of the erection of a steel framed industrial building, reinforced concrete slabs of varying levels and tight construction tolerances, reinforced concrete perimeter walls and a reinforced concrete fuel store and conveyor room constructed to supply the boilers. Additional works included the relocation of existing utility services, construction of buried pipe work and electricity supply, construction of an internal blockwork wall and external works to tie the building into the e