Case Study

BIM for the subsurface

BIM for the subsurface

Pages 11 Pages

AGILE BIM for the subsurface Carl Grice AXELOS.com Case Study June 2017Contents Introduction 3 The project 4 Conclusion 8 About the author 11 About AXELOS 11 Trade marks and statements 11BIM and the subsurface 3 1 Introduction 1.1 WHAT WAS THE PROBLEM? Unforeseen ground conditions are one of the major causes of project delay in the construction industry, contributing to approximately a third of all construction programme overruns. This can be