BHGE VACS technology and chemicals provided ultimate well clean-out

BHGE VACS technology and chemicals provided ultimate well clean-out

Pages 1 Pages

BHGE VACS technology and chemicals provided ultimate well clean-out Challenges • Perform clean out in the lateral from 7,619 to 10,188 ft (2,569 ft total) • 4.500-in. 11.60 ft/lb production casing filled with multiple types of debris from previous operations • Loss of circulation during the clean-up operations preventing adequate conventional or reverse circulation operations Results • Reduced costs required for coiled tubing unit rental and energized fluids, saving the operator $180,000 USD • Reduced the operational risk of getting stuck associated with coiled tubing in a horizontal, low-bottomhole pressure well • Recovered 50.5 joints of 2.375-in. tubing filled with debris (222 gals or 5.29 bbls) • Over, 2,600 lbs of total debris was recovere