Case Study
BG Miskar
*Project carried out by Acergy prior to merger with Subsea 7. seabed-to-surface Client: BG Tunisia Location: Offshore Tunisia Project Type: SURF BG Miskar Subsea 7* worked on this SURF project for BG Tunisia (BGT) to develop the Miskar Gas Field. Using the Acergy Falcon, Subsea 7 was able to install 25% Cr Super Duplex pipelines and install a 75t 70m long single piece riser bundle from the Acergy Discovery - a ground breaking innovation