Case Study

BG Clamp Replacement

BG Clamp Replacement

Pages 2 Pages

AN IN-DEPTH LOOK AT OUR PROJECTS. DELIVERING SUBSEA N-SEA EXPERIENCE: PEOPLE / VESSELS / EQUIPMENT BG – CLAMP REPLACEMENTN-SEA: CASE STUDY CASE STUDY / WWW.N-SEA.COM PROJECT FEATURES Charter of DSV ‘Siem N-Sea’ for the provision of vessel based nitrox diving services and WROV. N-Sea was contracted by BG Group to carry out the North Everest and Lomond Firewater Caisson Clamp installation and survey scope at the North Everest and Lomond Platform

Join for free to read