Case Study

BESPOKE SOLUTIONS FOR A WAVE ENERGY CONVERTER INSTALLATION

BESPOKE SOLUTIONS FOR A WAVE ENERGY CONVERTER INSTALLATION

Pages 2 Pages

THE PROBLEM The team was tasked to deliver against the following mooring requirements: 1. Simplifying the WEC deployment by using a single North Sea Anchor Handling Vessel and no air diving personnel 2. Designing a lightweight mooring system while maximising cost-effectiveness by using the current inventory of mooring equipment 3. Demonstrating the WEC could be successfully towed to port THE SOLUTION InterMoor was responsible for the following work scope: ? Development of detailed installation procedures for the mooring system ? Development of bespoke deployment procedures for the WEC ? Provision and installation of the entire mooring system ? Project management of the installation and provision of specialist personnel for execution ? Execution of vessel mobilisation in port and