Case Study

BESPOKE INTEGRATED SOLUTION FOR SUBSEA PILE INSTALLATION MONITORING

BESPOKE INTEGRATED SOLUTION FOR SUBSEA PILE INSTALLATION MONITORING

Pages 1 Pages

THE PROBLEM A globally established subsea engineering and construction, long-term client, were faced with an integration challenge during a subsea construction project to monitor the pitch and roll of a subsea pile during installation. THE SOLUTION Seatronics worked closely with the client to design a bespoke integrated solution for their unique offshore project requirements. A rechargeable system with batteries was developed, integrated with a Seatronics SeaMesh system for reliable communications and custom-built cabling to operate an iXblue Octans gyrocompass and motion sensor. GPS receivers and a remote on/off switch were also implemented to conserve battery life when not in use during operations and an external pack was provided to adapt the solution for longer scopes. THE R