Case Study
Bathroom Extensions
Highlights This innovative construction project for the Peabody Trust, replaced traditionally built bathroom extensions with pre- manufactured steel pods, complete with new bathroom suites, fixtures and fittings already installed. The easier to install pod system used on the 1 1 property bathroom renewals, is estimated to have saved the programme over eight weeks, reducing resident disruption and impact on the local community. An equally cre