Bath Road, Corsham, Wiltshire Section 278 & On-Site Works
§ Provide detailed engineering input to reserved matters planning application. § Provide detailed designs for Section 38 and Section 104 submissions. § Detailed design of private areas to determine finished floor levels, private drainage etc. Benefits of Our Involvement § Long-standing relationships with highway authority officers enabled the Section 278 technical approval process to be resolved in a timely manner. § CEC experience in providing cost effective and adoptable drainage solutions enabled a surface water/SUDS scheme to be devised. Background Cole Easdon Consultants (CEC) were appointed to undertake the detailed design for the new roundabout and priority junction Section 278 designs, and for the on-site detailed engineering design (Section 38 and Section 104) for this 150- dwelli